BETA
Pothole Material Calculator
Calculate required cold-mix asphalt mass in kg/lbs, uncompacted placement depth, retail packaging units, and the exact SOUP liquid binder mixing recipe for pothole restorations and utility cuts.
Engineering Disclaimer (Beta): Estimations generated by this tool are for project planning, material estimation, and preliminary budgeting purposes only. Actual field consumption may vary depending on cavity geometry, subgrade compaction, aggregate grading, and ambient temperature. Always refer to official HALIK technical data sheets or consult our engineering team for critical infrastructure applications.
Pothole Dimensions & Geometry
Measurement System
Cavity Geometry
Standard Size Presets
cm
cm
cm
qty
SOUP Cold Mix Production Recipe
| Component | Standard Proportion | Batch Mass Required |
|---|---|---|
| Reclaimed Asphalt Pavement (RAP) | 95.8% (dry aggregate) | -- |
| Hydrated Lime / Mineral Filler | 2.0% (anti-strip activator) | -- |
| SOUP Liquid Binder | 2.2% (concentrated additive) | -- |
| Total Ready Cold Mix | 100.0% | -- |
Required Cold Asphalt Mix
1 Pothole
0.0
kg
≈ 0.0 lbs
✓ Includes +2.0 cm compaction overfill for smooth, flush post-traffic surface.
Net Volume
0.0 L
0.00 cu ft
Uncompacted Placement
0.0 cm
includes crown
Loose Mix Volume
0.0 L
prior to compaction
Total Bulk Tonnage
0.000 t
0.000 short tons
Standard Retail Bag Counts
20 kg Bag
0
Bags needed
25 kg Bag
0
Bags needed
50 lb Bag
0
Bags needed
Placement Cross-Section
5-Step Installation Process
1
Cavity Preparation
Sweep out loose debris, standing water, and loose stone. Squared vertical edges provide optimal mechanical lock.
2
Recipe Mixing
Tumble 95.8% RAP aggregate, 2.0% hydrated lime, and 2.2% SOUP liquid binder until uniformly coated and glossy black.
3
Placement & Overfill
Shovel cold-mix into cavity. Crown 1.5–2.0 cm (0.6–0.8 in) above existing pavement grade to account for compaction reduction.
4
Compaction
Tamp thoroughly with hand tamper, roller, or vibratory plate. In traffic areas, vehicle tires provide ongoing supplementary compaction.
5
Immediate Traffic Opening
No cooling or curing required. Open immediately to full traffic loads. Optional TL-2000 coat provides total water-seal.